Lockout/Tagout (LOTO) Guide: OSHA 1910.147 Rules, 6 Steps and Interview Questions (2026)
What OSHA’s lockout/tagout rule actually requires: the energy control program, authorized vs. affected employees, the six steps, annual inspections, group lockout, and how LOTO works during commissioning at a new plant.










