TL;DR: PE license comity, also called licensure by endorsement, is how a licensed PE gets a license in a second state without retaking the exams. Most engineers do it through an NCEES Record. The Record is free to set up and has no annual renewal, and NCEES lists $175 for the first comity transmittal and $100 for each one after that. Building the Record takes about 2–3 weeks on average, and then each state board runs its own application, fee and review. Texas, for example, says its average processing time is about two months.
I recruit for roles like this on U.S. fab and plant projects, and the multi-state license question comes up all the time. A project engineer licensed in one state gets an offer for a semiconductor fab project in Texas or a battery plant in Georgia. The hiring manager asks, “Can you be licensed here by start date?” The honest answer depends on how organized your records are.
This guide covers PE license comity step by step: what comity and endorsement mean, what goes into an NCEES Record, what the Model Law Engineer designation does, real rules from four state boards I checked myself, and a realistic timeline. If you’re still working toward your first license, NCEES and your state board are the places to start. This article is for engineers who already hold one.
What PE license comity means (and why it isn’t “reciprocity”)
People say “reciprocity,” but most boards don’t automatically honor each other’s licenses. Comity or endorsement means the new state reviews your file and decides whether your original license was earned under standards that meet its own. If so, it issues its own license, usually without new FE or PE exams. A few boards say this very directly:

- Texas: “The Act does not allow a true reciprocity or comity between Texas and another state.” Licensees from other states can still apply, and the board accepts NCEES exam results passed elsewhere (TBPELS FAQ).
- New York: “New York State does not have a reciprocity/comity agreement with any jurisdiction.” It licenses by endorsement if you meet all New York requirements except the exam (NYSED).
- Ohio: “The Board does not automatically grant an Ohio license because an individual is licensed in another jurisdiction” (Ohio PE Board).
So think of PE license comity as a second full review that you can make easier, not as a rubber stamp. The more your file looks like a standard U.S. path (EAC/ABET degree, FE, PE, four years of experience, clean record), the smoother it goes.
The NCEES Record: what’s in it and what it costs
An NCEES Record is a verified package of your licensure history that NCEES stores and sends to boards for you. According to the NCEES Records Program page, it has five sections:
- Education: every college, university and technical school you attended, with transcripts for all credit-bearing work.
- Work experience: a chronological list starting at graduation or your first job after high school.
- Applicant questions: the status and history of your license or licenses.
- Exam and license verification: confirmed by the state board.
- Professional references: five references who know your professional reputation. For engineers, they must be U.S.-licensed engineers.
| NCEES Record item | Fee listed by NCEES |
|---|---|
| Record application | No charge |
| Annual renewal | None |
| First transmittal, comity licensure | $175 |
| First transmittal, initial licensure or PE/PS exam approval | $100 |
| Each later transmittal | $100 |
| Model Law Structural Engineer application | $50 |
| Military transmittal (active duty and spouses under orders) | No charge |
Two notes from that page matter in real life. First, work experience verifications don’t expire, but some other verifications do. NCEES suggests updating them only when you’re ready to transmit. Second, the transmittal “does not replace the board’s own application process or fees.” You still apply to the new state and pay its fee.
“I’m licensed in one state. Can I add another from overseas?”
This comes up whenever engineers get pulled onto projects in a new state. Candidates licensed in one state, sometimes while living overseas, ask me whether they can register in another state or will have to pay a local PE to stamp the work. What they want is a clear checklist, and it’s hard to find one.
The NCEES Records Program page answers part of it. Setting up a Record is free and there’s no annual renewal fee; you pay when you transmit it, $175 the first time for comity licensure and $100 for each transmittal after that. Georgia, Kentucky, Massachusetts, Puerto Rico, Rhode Island and Wyoming require a Record before you apply for comity. NCEES also says plainly that a Record does not guarantee licensure in any jurisdiction. Each state sets its own rules, so the state board makes the final call.
Before you accept a role that needs a stamp in a new state, ask: “Who on the team is already licensed there, and who pays the comity fees?”
How transmittal works and what Model Law Engineer means
You apply through the multistate licensure dashboard in MyNCEES. NCEES reviews your materials. Once the Record is set up, it sends the package to the board you pick, and you review and update the Record before each transmittal. NCEES says a Record is accepted by all U.S. state licensing boards but doesn’t guarantee a license anywhere. Some states require one before you even apply for comity: Georgia, Kentucky, Massachusetts, Puerto Rico, Rhode Island and Wyoming (NCEES).
NCEES staff also check every Record for a Model Law designation automatically. You don’t have to request it. A Model Law Engineer (MLE) has:
- A bachelor’s degree in engineering from an EAC/ABET-accredited program
- Four years of acceptable engineering experience
- Passing results on both the FE and PE exams
- A clean disciplinary record
NCEES says the designation “may speed comity licensure in many states.” Structural engineers can also apply for Model Law Structural Engineer (MLSE) for $50. It requires at least 18 semester hours of structural analysis and design (including at least 9 hours of design), certain structural exams and four years of structural experience. If your degree isn’t EAC/ABET-accredited, you can still have a Record. NCEES requires its Credentials Evaluations service for Records holders with non-accredited degrees (NCEES).
Four state comity pages compared
I opened each board’s own page in October 2026. Rules change, so always re-check before you apply.
| State | NCEES Record | Key rules | Timing or fee shown |
|---|---|---|---|
| Georgia | Required before you apply | Original license must have been earned under requirements equal to or higher than Georgia’s | Not listed on the page |
| Texas | Optional; can replace some application items | No true comity; accepts NCEES exams passed elsewhere; Texas Ethics Exam still required; 3 references, or 5 PE references if you request waivers | Average processing about two months (eight weeks) |
| New York | Accepted; submit Form 1 and request transmittal | Endorsement only; must meet all NY requirements except the exam, including two years with codes and practices commonly used in the U.S. | Licensure and first registration fee $377 |
| Ohio | Accepted; since Dec. 1, 2024 all transcripts go through NCEES | FE and PE both required with no exceptions; 5 references, 3 of them PE; fees non-refundable | Not listed on the page |
California is another example of a board that allows Records. Its PE application page says comity applicants “may submit NCEES Records” in place of work experience engagements, references and transcripts. It also warns that an application can be treated as abandoned if requested information isn’t provided within 90 days.
How long PE license comity takes: a realistic timeline
There’s no single national number, so I add up the parts the official pages publish:
- Collect documents yourself. Transcripts and references are where delays start. NCEES can’t move until they arrive.
- Build the Record. NCEES puts the average at 2–3 weeks, depending on the application.
- Transmit and file the state application. Pay the $175 first comity transmittal and the board’s own fee.
- Board review. Texas lists an average of about eight weeks, and waiver requests take longer. Other boards I checked don’t publish a number.
- State-specific extras. These include the Texas Ethics Exam and any extra forms the board asks for.
My advice to candidates: if a new job depends on the license, start the Record the week you accept the offer, or even earlier. Once a Record exists, every later state is mostly an update plus a $100 transmittal. When you negotiate, ask the employer to cover these fees and the board fee. I cover that kind of ask in how to negotiate salary at a Korean company and the offer letter checklist.
Why fab and plant project engineers often need several state licenses
Engineering licenses are issued state by state, so the license has to match where the project is, not where your office is. On large advanced-manufacturing projects that adds up fast:
- Projects move. A design team might support a semiconductor fab project in Texas, then a battery plant in Georgia, then an expansion in Ohio or Arizona. Each one has its own board.
- Sealed documents. Whoever signs and seals drawings or calculations has to be licensed in that state, so firms look for engineers who can get there quickly.
- Multi-discipline scopes. MEP, process piping, structural and fire protection packages can each need a licensed engineer in the project state.
- Korean-affiliated owners. When the owner’s HQ is in Korea and the design is split between Korean and U.S. teams, a bilingual U.S.-licensed engineer is often the link between them. These roles move quickly, and having a Record ready is a real advantage. See jobs at Korean battery and chip plants and Korean companies hiring in Texas.
Project roles that travel often come with per diem and relocation terms too. Check those with the per diem calculator and read the construction per diem guide.
Questions to ask before you accept a multi-state role
- Which states do you need me licensed in, and by when?
- Will the company pay for NCEES transmittals, state application fees and renewals?
- Who seals drawings until my new license is issued?
- Will the company also cover continuing education hours for every state I hold?
- Is the license a condition of employment written into the offer?
FAQ
Is an NCEES Record required for PE license comity?
Not everywhere. NCEES lists Georgia, Kentucky, Massachusetts, Puerto Rico, Rhode Island and Wyoming as requiring one before a comity application. In other states it’s optional but often saves time.
How much does an NCEES Record cost?
Applying is free and there’s no annual renewal. The first comity transmittal is $175 and later ones are $100 each. State fees are separate.
Do I have to retake the PE exam in a new state?
Usually not if your exams were NCEES exams. Texas, for example, accepts NCEES results passed in another state. Some boards add their own ethics or jurisprudence step.
What is a Model Law Engineer?
It’s an NCEES designation for engineers with an EAC/ABET degree, four years of experience, passing FE and PE results and a clean record. NCEES says it may speed comity in many states.
Who can be my references?
For an NCEES Record, you need five U.S.-licensed engineers who know your professional reputation. Some states add their own rules, so check the board.
Not legal advice; your state board’s rules decide. Fees and rules checked October 2026 and subject to change. Sources: NCEES Records Program, NCEES Credentials Evaluations, TBPELS Licensing FAQ, TBPELS PE Application Process, NYSED PE License Requirements, Georgia PELS, Ohio PE Board Reciprocity, California BPELSG PE Application.
Engineering exam prep and references on Amazon
Keep one folder with every license number, renewal date and reference contact; comity goes faster when it’s all in one place.
- Engineering project log notebook
- Document folder for licenses and certificates
- ASCE 7-22 minimum design loads
- ASME B31.3 process piping
- NFPA 13 handbook